Elgin B on tow from Ravenna2

Officially named in February, the Terra Nova FPSO is the first of its kind, designed specifically for the harsh environmental conditions offshore Newfoundland. Onceberthed at the Bull Arm site, it will undergo seven months of hook-up andcommissioning work prior to its journey offshore to begin producing oil from theTerra Nova oil field. By the timethe vessel arrives all the topsides modules and the upper turret will be in Bull Arm, and we’ll begin the next phase of the development – topsides hook up andcommissioning. We are looking forward to the day when the Terra Nova FPSO, once installed offshore, will start production of the second major oil field off Newfoundland and Labrador, further establishing the oil and gas industry here”. It is designed with a productioncapacity of up to , barrels of oil per day, and a storage capacity of , barrels. Over the summer and autumn, the FPSO vessel will undergo hook up and commissioning, in preparation for the planned voyage to the Terra Nova field toward the end of the year. The accommodation module was included in the vessel fabrication scope. The Terra Nova owners are: The Alliance consists of: Discovered in , Terra Nova is thesecond largest oil field off Canada’s East Coast, with estimated recoverablereserves of 3 70 million barrels of oil.

Hook

What is claimed is: A method of installing a turret system on to an existing vessel, the method comprising the steps of: A method according to claim 1, including the step of attaching a framework structure at the top of the turret assembly.

Manage any change to procedure (management of change) – Prepare Hook up strategy for Last mile connection (Girassol, Dalia, Pazflor and Clov FPSOs to the main fiber optic cable – main back bone). SURF HOOK UP COMPANY REPRESENTATIVE o/b FPSO na Total. Total. Escola Naval. Voir le profil. Voir les badges de profil. Chercher par nom.

Copy Right CapGrow Pte. All Rights Reserved Workshop Overview The course will provide a complete and comprehensive technical overview of an FPSO from design, construction and commissioning to start-up and operations. The delegates will be presented with the applicable rules and regulations, codes, standards and environmental issues and their impact on the design and operation in connection with floating production.

Safety in design and operation will give a comprehensive description of safety philosophies and risk management including the safety and control systems. The course continues with the commercial aspects of an FPSO and its operation. The advantages and disadvantages of a new built or a conversion and the cost impact. Two real life case studies will explain the design, construction and operation setbacks encountered during the projects and their cost impact.

A detailed outline of the environmental influence on the design and operation of the FPSO featuring the effects of wind, waves, current, climate and field and reservoir data on the behaviour of the FPSO equipment and operation. It will also guide the delegates through the mooring and turret system selection and installation by presenting the delegate with the types of systems, particulars and operation.

Subsea layout and installation will cover risers, umbilicals and flowlines including field installation. FPSO processing operations will focus on the topside equipment their particulars and issues. Mechanical handling and offloading comprises the crane utilization laydown areas, deck operations safety plan, offloading equipment and tanker mooring equipment and procedures.

DOF Subsea secures FPSO hook

Downtime or production stop was not an option and execution time was of high importance. Our LDC vessel, designed for offshore operations, supported the crew during the operations, keeping our quality and safety standard. The challenge was to affect the Rig with the minimum amount of downtime.

Jan 23,  · The turret contains equipment to hook-up the anchoring chains 15, to fix them in stoppers and to hook-up the flexible risers The turret consists of two cylinders with vertical axes, the outer cylinder 1 and the inner cylinder 2, 6 m. old and m. old respectively in one specific design.

Managed and formulate the strategy for contractual disputes in a professional manner and drive solution to closure while maintaining a good relationship with clients. Driven and persuaded client successfully for entitlement of six months EOT and additional budget through negotiation and claims supported by performed contractual schedule analysis, continuously monitored changes, identified significant risk, and strictly controlled cost in line with organizational procedures.

As a topside project manager, constructively driven installation of modules and integration works on time through coordination and expediting fabricators, vendors, engineering, construction and commissioning team in an ethical manner while meeting quality, budget and classification requirements. Engineering Project Manager Exmar-Caribbean FLNG Led engineering department; managed resources and budget; acted as a point of engineering communication; supervised design, calculation, studies, integration and interface among hull, containment, liquefaction, and re-gas; identified and secured change order; supported construction and commissioning; reported progress in project meetings.

Delivered engineering documents timely to progress procurement and construction activities for world first LNG-FPSO through administering EEP, deliverables, schedules, classification, quality, contract, SOW matrix and KPI; Coordinating and Expediting subcontractors and vendors; Driving and collaborating with lead engineers and cross functional team; and Setting up documentation review and approval process using distribution matrix. Resolved a range of engineering problems successfully and kept project progression through closed collaboration with subcontractors, clients, and authorities by providing technical and functional leadership.

Delivered projects on time on target profit successfully by actively administering project execution plan, and managing project activities, such as; planning, scheduling, engineering, documentation, classification, fabrication, inspection, installation, commissioning, invoicing, resource leveling and utilization, and closing in line with organization guideline. Analyzed project problems, formulated remedies, and driven solution to closure to kept project on the right track.

Achieved timely delivery milestones; with the help of effective scheduling, critical path analysis, and cost control by using SAP system, resource sharing and manning plan, and diplomatic communication among and motivating team members.

FPSO DALIA DEEP SEA PROJECT

Sonsub Division contract to perform positioning and heading control for the hook-up operations of a new floating production, storage and offloading FPSO unit in a depth of m in the Aquila field, Adriatic Sea, Italy. Initiated in August , the agreement included carrying out FPSO positioning and heading control analyses; analyzing optimized anchor handling scenarios for the FPSO mooring hook-up; and producing marine and survey procedures.

InterMoor also procured the FPSO aft and forward towing equipment and provided tow masters and surveyors for the offshore operation. Aquila Field was developed in March ; 50 kilometers northeast of Brindisi, Italy, in international waters within the continental shelf. In , the old FPSO hull was inspected and proven to be unfit for further use. A shuttle tanker then moored up to the FPSO and the contents were discharged accordingly.

2H Offshore produced complex finite element models for both the tow-out and hook-up operations, modelling the turret buoy, its nine mooring lines and tug vessels to .

Reports to Project Manager. Be the single provider of cost, budget, milestone and progress data to parties outside the Engineering Department including: The Head of Engineering and Project Services shall participate in all phases of the project including, concept selection, FEED and project execution to ensure the technical objectives are met within the approved scope, budget and schedule and to the required quality standards The position is based in Nigeria and it is expected that the duration of the project will be 3 years.

The engineer will be expected to travel to locations where equipment is being manufactured such as, but not limited to the UK, US, Singapore, Dubai and Nigeria including stints offshore during hook up and commissioning. Promote effective communication and innovative challenge within the engineering disciplines in order to foster the production of safe, cost effective, fit for purpose and constructible designs.

Ensure all technical interfaces are identified and that the protocol for managing them is known by all disciplines and is being adhered to. Ensure that the protocol for managing concessions and deviations is known by all disciplines and is being adhered to.

Living proof assholes can talk. The 10 Biggest Assholes On The Wire

The area lies miles kilometers offshore Australia in to feet to meters of water. In , Ichthys was discovered by three exploration wells, and then appraised by five wells three years later. On March 27, , the partners reported that the field is commercially viable, and then submitted the field development plan for government approval. Field Development The development plan for Located on Block WA P, Ichthys is one of Australia’s biggest undeveloped gas projects estimated to contain recoverable reserves of Field Development The development plan for Ichthys includes several subsea wells tied-back to a central floating offshore processing facility for gas, and an FPSO for condensate.

Clough was contracted by Daewoo Shipbuilding & Marine Engineering (DSME) to provide hook-up services on the Ichthys LNG Project Floating Production, Storage and Offloading (FPSO) facility. The scope of work includes the preparation and execution of offshore hook-up .

UK operators are therefore revisiting their more marginal or problematic discoveries for potential development as a means of pro-longing UK production levels. The majority of these discoveries, some dating back to the s, have remained on the shelf due to a combination of technical risk, variable oil prices, and fiscal uncertainty.

Shell Expro’s Penguin Cluster in the Northern North Sea was a textbook case – a cluster of five fields collectively containing the third largest undeveloped accumulation of hydrocarbons on the UK continental shelf, behind the Clair and Bressay fields. Previous development of the Penguins had been precluded due to the large areal footprint of the cluster strung out over some 20 km and high subsurface risks reservoir connectivity and quality.

When at last a development opportunity was matured in the late s, the project had to be suspended due to the plunging oil price. Last year, however, the timing was finally right to move the scheme forward, 26 years after the initial discovery. This is roughly the same size as Shell Expro’s Brent field to the south, still one of the UK’s largest in terms of remaining reserves. If all goes according to plan, up to nine subsea wells could be drilled from five drill centers across the fields, exporting their wellstream through a km pipeline to the Brent C platform, shadowed by a similar length control umbilical.

On arrival at the platform, the fluids will be commingled with those from Brent and separated. Oil will then be sent through the Cormorant pipeline system to the Sullom Voe terminal on Shetland.

Gulf of Mexico FPSO enhanced by Intermoor’s chain tensioning and cutting

In the Gulf of Mexico, the technical and economical limitations inherent to other type of concepts, the lack of pipeline infrastructure in such deep areas, and the wide acceptance of the FPSO concept by Shelf Authorities will accelerate this process. One of the most critical issues in the design of FPSOs for ultra deep waters will be the selection of the most cost-efficient station keeping system for the specified operational requirements. Standard solutions based on internal turret and thruster assisted mooring systems are already being offered by the industry.

View Hien Le Quang’s profile on LinkedIn, the world’s largest professional community. Hien has 10 jobs listed on their profile. See the complete profile on LinkedIn and discover Hien’s connections and jobs at similar companies.

Generated lift planning and procedure for 80Te crane base and 80Te winch lifts Provided on-site supervision during lifting operations Designed and procured lift rigging Facilitated risk assessments and on-site toolbox talks Client: Managed fabrication of off 75Te mudmats and misc. Conducted installation engineering, lift analysis, seafastening design and developed installation procedures.

Provided offshore support on MODU for hook-up and tensioning operations. Detailed design and engineering: Scope included subsea connector selection, piping design, dynamic analysis existing jumper , material selection, pipe spool design, installation methodology and ROV clearance study. Responsible for oversight of diverless connector and misc subsea components manufacturing activities.

The subsea structure had been previously installed and was sitting at a 15deg list which was outside acceptable limits. Design lift weight was on the order of 40 Te.

mooring SURF conversion FPSO track record

It is an opportunity for us to reflect on the language and ideas that represented each year. So, take a stroll down memory lane to remember all of our past Word of the Year selections. Change It wasn’t trendy , funny, nor was it coined on Twitter , but we thought change told a real story about how our users defined

fpso hook-up and tensioning The scope of work for mooring system hook-up and tensioning in sequence of installation activities are listed below: Completed installation of mooring system (pile installation, chain laying and mooring system pre-tensioning.

Operator Update A recent study conducted by OGX on the three producing wells at its Tubarao Azul field revealed that there is no way to economically increase the life of the field using current technology and that the existing wells could cease to produce by Unexpected behavior in the producing wells caused OGX to undertake the study which included reprocessing and reinterpretation of the existing geological and geophysical data. As a result, a new reservoir model was developed that revealed intense compartmentalization and discontinuity of the reservoirs.

OGX plans to submit a motion to Brazil’s ANP to suspend development of the remaining Tubarao fields with the exception of Tubarao Martelo which will proceed with development as planned. First production for Tubarao Martelo remains on track for 4Q The well is now flowing at an effective production rate after progressing through the initial clean-up phase.

Connect FPSO